Four heavy machines, three transport modes: China to Brazil

by Röhlig Team last update:

Moving four exceptionally heavy machines across three countries would demand close coordination under any circumstances. For this project, Röhlig also had to manage crane handling, oversize and overweight road permits across eight US states, in-bond compliance and the exacting requirements of a commercial air service. When damage to the final machine’s wooden platform threatened its planned flight, the team responded over the weekend. A replacement platform was built in less than 48 hours, enabling the cargo to be re-tendered in time for the Wednesday morning departure.

Download Case Study

Project Highlights

Customer Industry Multimodal heavy machinery
Origin China
Destination Brazil
Transport Modes Sea Freight, Road Freight, Air Freight
Teams Involved China, Germany, United States and Brazil
Additional Services Crane handling, oversize and overweight permits, in-bond transport, export documentation, carrier coordination and emergency platform rebuilding
Cargo Four exceptionally heavy machines

Project Overview

The customer required four heavy machines to be transported from China to Brazil using a hybrid, multimodal solution.

The route began with sea freight from China to Los Angeles. Each machine then travelled by flatbed truck from Los Angeles to Miami, crossing eight US states, before being flown individually from Miami International Airport to Viracopos International Airport in Brazil.

Every stage had to be planned around the machines’ exceptional weight, handling limitations and strict compliance requirements.

The Challenge

The physical characteristics of the cargo ruled out conventional handling. Forklifts were unsuitable, so cranes were required for offloading and other critical handling operations.

The US road movement added another layer of complexity. Oversize and overweight permits were required throughout the eight-state journey, while the cargo had to move in bond using TSA-certified flatbed trucking. Restrictions on overnight stops further limited the available operating plan.

The air freight stage also required careful preparation. Röhlig had to coordinate the loading arrangements and provide accurate cargo information to secure Atlas Air’s acceptance of each heavy piece on a commercial service. The machines were transported individually, with ramp access and heavy-duty cranes required for handling at Viracopos Airport.

Documentation was equally critical. Import, export and in-bond paperwork had to remain accurate and consistent across multiple modes, jurisdictions and operational handovers.

The Solution

A coordinated multimodal route

Röhlig developed an end-to-end plan connecting ocean, road and air freight. Teams in China, Germany, the United States and Brazil coordinated responsibilities across the route, with local support at the major handover points in Los Angeles, Miami and Brazil.

The operating plan covered:
 

  • Ocean transport from China to Los Angeles
  • Permitted flatbed trucking across eight US states
  • In-bond movement under the applicable security restrictions
  • Precise import and export documentation
  • Individual tendering of each machine to the airline
  • Ramp access and crane handling for the heavy cargo
  • Coordination with the carrier to meet commercial-aircraft acceptance requirements

Emergency recovery in under 48 hours

The final machine presented an unexpected challenge when its wooden platform was damaged because unsuitable construction materials had been used.

Röhlig recovered the cargo from the airline over the weekend and arranged an emergency rebuild. The replacement platform was completed in less than 48 hours, allowing the machine to be re-tendered in time for the Wednesday morning flight.

This rapid response depended on immediate decision-making, access to suitable materials and close coordination between the operational teams, handling partners and airline.

The Result

Röhlig successfully coordinated four heavy machines through a complex China-US-Brazil routing involving three transport modes and numerous controlled handovers.

Key outcomes included:
 

  • Oversize and overweight road transport managed across eight US states
  • Carrier acceptance secured for each machine on a commercial air service
  • In-bond and export requirements coordinated throughout the US movement
  • Specialist crane handling arranged where forklifts could not be used
  • A damaged wooden platform rebuilt in less than 48 hours
  • The final machine re-tendered in time for its Wednesday morning flight
  • Effective collaboration between Röhlig teams in China, Germany, the United States and Brazil

The project demonstrated the value of combining local operational knowledge with central coordination when unusually heavy cargo must move across modes, borders and time-critical milestones.

This project showed the value of strong network communication and coordination across China, the United States, and Brazil. By working closely across all three countries, our teams were able to manage complex handovers, oversize cargo requirements, in-bond movements, carrier coordination, and unexpected operational challenges(packaging structure malfunction) while keeping the shipment moving as planned. When the final platform was damaged, our teams and partners acted immediately, completing the rebuild in under 48 hours and meeting the re-tender deadline.
Man in a checked shirt with a short beard looks into the camera against a blurred office background
Cristian Roman
Regional Air Freight Manager • Procurement Air
Röhlig USA

Questions and answers

How can exceptionally heavy machinery be transported internationally?

Heavy machinery may require a multimodal solution combining ocean, road and air freight. The transport plan must account for cargo dimensions and weight, suitable loading equipment, road permits, carrier acceptance criteria, customs requirements and safe handovers between modes.

What permits are required for oversized cargo moving by road in the United States?

Permit requirements depend on the cargo dimensions, weight, route and states involved. In this project, oversize and overweight permits were required across eight states, supported by detailed route planning and specialist flatbed transport.

Can exceptionally heavy cargo travel on a commercial air service?

Yes, subject to the aircraft’s capabilities and the airline’s acceptance requirements. Accurate cargo information, appropriate packaging, loading plans, ramp access and specialist lifting equipment may all be required. In this project, each machine was prepared and transported individually.

Discover more case studies

    • Renewable energy and solar power
    Construction site with containerised energy storage units, crane and solar field in a vast desert landscape from above

    71 BESS Units Installed at a Solar Park in Chile

    Chile

    Chile

    Challenge
    On-site installation
    Via
    Contract logistics

    At the final installation point, every movement mattered. A renewable energy customer required 71 Battery Energy Storage System (BESS) units to be lifted and positioned precisely at a solar photovoltaic park in Huatacondo, northern Chile. Working under demanding desert conditions, Röhlig Chile delivered a coordinated, month-long operation covering planning, specialised lifting, heavy cargo handling, warehousing support and on-site execution. All 71 units were installed safely, accurately and on schedule.

    • Industrial / Manufacturing
    Freight pallets with Röhlig banner, forklift and cargo aircraft on the airport apron

    Two charter flights keep a supply chain moving

    Peru

    Bolivia

    Challenge
    Time-critical shipment
    Via
    Air, Charter

    When an urgent shipment from Lima to Santa Cruz became critical to business continuity, an industrial manufacturer needed a transport plan built around its deadline. Röhlig Bolivia designed and executed two dedicated air charter flights, ensuring the confidential commercial cargo reached its destination safely and on schedule.

    • Cement manufacturing and construction materials
    Four people standing outdoors near a large industrial facility with concrete structures, conveyors, and trees.

    Delivering a cement plant expansion by sea and road

    China

    South Africa

    Challenge
    Oversized cargo
    Via
    Sea

    An initial 90 TEU import marked the beginning of a much larger logistics partnership. Following a successful first delivery, Röhlig-Grindrod was awarded an extensive cement plant expansion project involving three breakbulk movements over two years. In total, approximately 12,000 tonnes of project cargo travelled from Shanghai, China, through the Port of Durban to the customer’s plant in South Africa. The programme required close control of customs processing, cargo handling, specialist transport and final delivery, with individual pieces weighing up to 80 tonnes.