71 BESS Units Installed Safely at a Solar Park in Chile

by Röhlig Team last update:

At the final installation point, every movement mattered. A renewable energy customer required 71 Battery Energy Storage System (BESS) units to be lifted and positioned precisely at a solar photovoltaic park in Huatacondo, northern Chile. Working under demanding desert conditions, Röhlig Chile delivered a coordinated, month-long operation covering planning, specialised lifting, heavy cargo handling, warehousing support and on-site execution. All 71 units were installed safely, accurately and on schedule.

Download Case Study

Project Highlights

Customer Industry Renewable energy and solar power
Origin Chile
Destination Chile
Transport Modes Specialised contract logistics
Teams Involved Chile
Additional Services Project planning, heavy cargo handling, warehousing support and on-site coordination
Cargo 71 Battery Energy Storage System units

Project Overview

The customer needed to install 71 BESS units at a solar photovoltaic park in northern Chile. Each battery had to be lifted and positioned safely and precisely while the project remained on schedule.

The assignment called for an integrated approach combining renewable energy logistics expertise with tightly managed on-site operations.

The Challenge

Installing battery energy storage systems at a remote solar project requires careful control at every stage. For the Huatacondo operation, the team needed to:
 

  • Plan the lifting and positioning of 71 individual battery units
  • Maintain precise handling throughout the installation process
  • Coordinate people, equipment, warehousing support and site activities
  • Operate safely under demanding desert conditions
  • Complete the full programme within one month

Safety and operational discipline were central to the assignment. The sequence had to keep work progressing efficiently without compromising the accurate placement of any unit.

The Solution

Röhlig Chile developed a comprehensive contract logistics solution tailored to the on-site requirements of the solar park.

The scope included:
 

  • Detailed operational planning for the month-long installation programme
  • Specialised lifting and heavy cargo handling
  • Precise positioning of each BESS unit
  • Warehousing support aligned with site requirements
  • Continuous on-site project coordination

By managing these activities as one integrated operation, the local team maintained control over the lifting sequence and supported safe, orderly progress throughout the project.

The assignment also demonstrated how Röhlig Chile can support energy and industrial customers beyond traditional freight forwarding, combining project execution with specialised handling and contract logistics services.

The Result

Over one month, Röhlig Chile successfully installed and positioned all 71 BESS units.

The operation achieved:
 

  • Safe and accurate positioning of 71 battery units
  • Completion of the full programme on schedule
  • One month of operations conducted safely under challenging desert conditions
  • Coordinated delivery of lifting, heavy cargo handling, warehousing support and on-site logistics
  • A proven contract logistics solution for a major renewable energy project

The project strengthened Röhlig Chile's experience in supporting renewable energy infrastructure through specialised, site-focused logistics.

This project demonstrates the strength of combining detailed planning, specialised lifting and close on-site coordination. Successfully positioning all 71 BESS units safely and on schedule was the result of strong teamwork and disciplined execution throughout the entire operation.
Smiling woman in a yellow blazer in a warehouse with shelving and boxes in the background
Eva Velasquez
Contract Logistics Supervisor
Röhlig Chile

Questions and answers

What logistics services did Röhlig provide for the BESS installation?

Röhlig Chile provided detailed planning, specialised lifting, heavy cargo handling, warehousing support and on-site project coordination.

How many BESS units were installed at the solar park?

The team safely lifted and positioned 71 Battery Energy Storage System units over a one-month operating period.

What made the solar park project challenging?

The work required precise heavy lifting under demanding desert conditions while maintaining high safety standards and completing the installation on schedule.

Discover more case studies

    • Industrial / Manufacturing
    Freight pallets with Röhlig banner, forklift and cargo aircraft on the airport apron

    Two charter flights keep a supply chain moving

    Peru

    Bolivia

    Challenge
    Time-critical shipment
    Via
    Air, Charter

    When an urgent shipment from Lima to Santa Cruz became critical to business continuity, an industrial manufacturer needed a transport plan built around its deadline. Röhlig Bolivia designed and executed two dedicated air charter flights, ensuring the confidential commercial cargo reached its destination safely and on schedule.

    • Cement manufacturing and construction materials
    Four people standing outdoors near a large industrial facility with concrete structures, conveyors, and trees.

    Delivering a cement plant expansion by sea and road

    China

    South Africa

    Challenge
    Oversized cargo
    Via
    Sea

    An initial 90 TEU import marked the beginning of a much larger logistics partnership. Following a successful first delivery, Röhlig-Grindrod was awarded an extensive cement plant expansion project involving three breakbulk movements over two years. In total, approximately 12,000 tonnes of project cargo travelled from Shanghai, China, through the Port of Durban to the customer’s plant in South Africa. The programme required close control of customs processing, cargo handling, specialist transport and final delivery, with individual pieces weighing up to 80 tonnes.

    • Multimodal heavy machinery
    Film-wrapped heavy machine is lifted onto a low-loader by crane in the logistics centre.

    Four heavy machines, three transport modes

    China

    Brazil

    Challenge
    Heavy machinery transport
    Via
    Sea, Road, Air

    Moving four exceptionally heavy machines across three countries would demand close coordination under any circumstances. For this project, Röhlig also had to manage crane handling, oversize and overweight road permits across eight US states, in-bond compliance and the exacting requirements of a commercial air service. When damage to the final machine’s wooden platform threatened its planned flight, the team responded over the weekend. A replacement platform was built in less than 48 hours, enabling the cargo to be re-tendered in time for the Wednesday morning departure.