71 BESS Units Installed Safely at a Solar Park in Chile
At the final installation point, every movement mattered. A renewable energy customer required 71 Battery Energy Storage System (BESS) units to be lifted and positioned precisely at a solar photovoltaic park in Huatacondo, northern Chile. Working under demanding desert conditions, Röhlig Chile delivered a coordinated, month-long operation covering planning, specialised lifting, heavy cargo handling, warehousing support and on-site execution. All 71 units were installed safely, accurately and on schedule.
Project Highlights
| Customer Industry | Renewable energy and solar power |
|---|---|
| Origin | Chile |
| Destination | Chile |
| Transport Modes | Specialised contract logistics |
| Teams Involved | Chile |
| Additional Services | Project planning, heavy cargo handling, warehousing support and on-site coordination |
| Cargo | 71 Battery Energy Storage System units |
Project Overview
The customer needed to install 71 BESS units at a solar photovoltaic park in northern Chile. Each battery had to be lifted and positioned safely and precisely while the project remained on schedule.
The assignment called for an integrated approach combining renewable energy logistics expertise with tightly managed on-site operations.
The Challenge
Installing battery energy storage systems at a remote solar project requires careful control at every stage. For the Huatacondo operation, the team needed to:
- Plan the lifting and positioning of 71 individual battery units
- Maintain precise handling throughout the installation process
- Coordinate people, equipment, warehousing support and site activities
- Operate safely under demanding desert conditions
- Complete the full programme within one month
Safety and operational discipline were central to the assignment. The sequence had to keep work progressing efficiently without compromising the accurate placement of any unit.
The Solution
Röhlig Chile developed a comprehensive contract logistics solution tailored to the on-site requirements of the solar park.
The scope included:
- Detailed operational planning for the month-long installation programme
- Specialised lifting and heavy cargo handling
- Precise positioning of each BESS unit
- Warehousing support aligned with site requirements
- Continuous on-site project coordination
By managing these activities as one integrated operation, the local team maintained control over the lifting sequence and supported safe, orderly progress throughout the project.
The assignment also demonstrated how Röhlig Chile can support energy and industrial customers beyond traditional freight forwarding, combining project execution with specialised handling and contract logistics services.
The Result
Over one month, Röhlig Chile successfully installed and positioned all 71 BESS units.
The operation achieved:
- Safe and accurate positioning of 71 battery units
- Completion of the full programme on schedule
- One month of operations conducted safely under challenging desert conditions
- Coordinated delivery of lifting, heavy cargo handling, warehousing support and on-site logistics
- A proven contract logistics solution for a major renewable energy project
The project strengthened Röhlig Chile's experience in supporting renewable energy infrastructure through specialised, site-focused logistics.
Questions and answers
What logistics services did Röhlig provide for the BESS installation?
Röhlig Chile provided detailed planning, specialised lifting, heavy cargo handling, warehousing support and on-site project coordination.
How many BESS units were installed at the solar park?
The team safely lifted and positioned 71 Battery Energy Storage System units over a one-month operating period.
What made the solar park project challenging?
The work required precise heavy lifting under demanding desert conditions while maintaining high safety standards and completing the installation on schedule.
Discover more case studies
-
- Industrial / Manufacturing
Two charter flights keep a supply chain moving
Peru
Bolivia
- Challenge
- Time-critical shipment
- Via
- Air, Charter
-
- Cement manufacturing and construction materials
Delivering a cement plant expansion by sea and road
China
South Africa
- Challenge
- Oversized cargo
- Via
- Sea
-
- Multimodal heavy machinery
Four heavy machines, three transport modes
China
Brazil
- Challenge
- Heavy machinery transport
- Via
- Sea, Road, Air