by Röhlig Team last update:

Röhlig combined technical feasibility planning with coordinated road, air and ocean execution for a manufacturer of lithium-ion batteries. One complex road movement became the foundation for a wider international logistics programme. After reviewing the handling concept for oversized lithium-battery equipment, Röhlig recommended a flat-rack and crane solution in place of the proposed reefer and slip-sheet method. The team then aligned specialist suppliers and Röhlig colleagues in the United Kingdom, Germany, Australia and Canada around one operating plan.

Download Case Study

Project Highlights

Customer Industry Industrial technology, lithium-ion batteries
Origin United Kingdom
Destination Canada
Transport Modes Road Freight, Air Freight, Sea Freight
Teams Involved United Kingdom, Germany, Australia and Canada
Additional Services Feasibility review, onboarding, packing coordination, crane handling, lashing, on-site supervision and shipment tracking
Cargo Battery pack and power-system components
Confirmed Weights Air import: 1,158 kg; ocean units: 7.7 t main unit plus 400 kg supporting crate
Main Unit Dimensions Approximately 4.4 m × 2.0 m × 2.9 m

Project Overview

The manufacturer needed an operating method for oversized power-system equipment, specialist loading and multiple international transport modes. The immediate task was a road movement from the United Kingdom to Germany. The scope then expanded to a 1,158 kg air import from Australia to the United Kingdom and ocean units from the United Kingdom to Canada.

Röhlig connected technical handling decisions, supplier readiness, country teams and shipment visibility through one operating plan, drawing on its Project Logistics and Renewable Energy Logistics capabilities.

The Challenge

The complexity sat at the interface between engineering and transport: oversized equipment, specialist access and an initial handling proposal that needed to be tested before execution.
 

  • The proposed reefer and slip-sheet method introduced avoidable handling complexity and operational risk for the oversized equipment.
  • Packing, crane operations, lashing, road transport and destination handling had to be coordinated as one sequence rather than as separate bookings.
  • Activity across four countries required consistent onboarding, handovers and visibility, with completed and confirmed work clearly distinguished.

The Solution

  1. Redesigning the handling concept

    Röhlig began with a feasibility review of the cargo, access conditions and proposed loading method. The team recommended flat-rack and crane handling instead of the reefer and slip-sheet concept. This allowed the lifting and securing plan to be designed around the actual dimensions and operating environment of the cargo.
     

  2. Bringing the specialist network together

    Röhlig coordinated the packing company, crane provider, lashing specialists, road carrier and destination team. Equipment and suppliers were aligned before loading, access and positioning arrangements were tested around the cargo, and more than ten hours of on-site supervision supported controlled execution.
     

  3. Creating one cross-border operating plan

    Structured onboarding and historic lane data helped the participating teams work from a shared operational picture. The United Kingdom and Germany supported the completed road movement; Australia and the United Kingdom coordinated the confirmed 1,158 kg air import; and the United Kingdom and Canada supported the ocean scope for the 7.7 t main unit and 400 kg supporting crate.
     

  4. Matching each shipment to the right mode and visibility tools

    The programme used road, air and ocean freight according to the cargo and lane requirements. Röhlig’s Air Freight and Sea Freight services were coordinated with the project-handling plan, while two trackers provided added shipment oversight.

The Result

The first road movement was completed and unloaded successfully. More importantly, the technical consultation carried out before transport reduced handling risk and created a practical method that could be reused as the customer’s requirements expanded.
 

  • One completed road move from the United Kingdom to Germany, including successful unloading.
  • A confirmed 1,158 kg air import from Australia to the United Kingdom and an ocean scope from the United Kingdom to Canada covering a 7.7 t main unit and a 400 kg supporting crate.
  • One operating plan connecting origin, destination and specialist suppliers across four countries.
  • A documented base of dimensions, photographs, milestones and handling decisions for future planning and regional reuse.
This project shows why complex logistics begins before the cargo moves. By testing the proposed method, bringing the right specialists together and giving every country team one operating plan, we created a handling approach that could support the customer’s wider programme.
Smiling employee in business attire in front of a green wall with the Röhlig Logistics logo.
Holly Bond
Customer Solutions Supervisor
Röhlig UK

Questions and answers

How do you plan logistics for oversized lithium-battery equipment?

Planning starts with verified cargo dimensions and weights, route and site access, the lifting and securing method, and any applicable dangerous-goods requirements. The transport mode and equipment should then be selected against those facts, with packing, crane, lashing and destination partners involved before loading begins.

Why did Röhlig recommend flat-rack and crane handling for this project?

The feasibility review found that flat-rack and crane handling was better suited to the oversized equipment than the proposed reefer and slip-sheet method. It reduced avoidable handling complexity and allowed the lifting and cargo-securing plan to be built around the unit’s actual dimensions. The right method will always depend on the cargo, route and site conditions.

How can visibility be maintained across a multimodal, multi-country logistics programme?

Use one operating plan with clear ownership, common milestones and structured handovers between origin, destination and specialist suppliers. For this programme, historic lane data, coordinated onboarding, on-site supervision and two trackers supported oversight across the road, air and ocean scopes.

Discover more case studies

    • Industrial / Manufacturing
    Freight pallets with Röhlig banner, forklift and cargo aircraft on the airport apron

    Two charter flights keep a supply chain moving

    Peru

    Bolivia

    Challenge
    Time-critical shipment
    Via
    Air, Charter

    When an urgent shipment from Lima to Santa Cruz became critical to business continuity, an industrial manufacturer needed a transport plan built around its deadline. Röhlig Bolivia designed and executed two dedicated air charter flights, ensuring the confidential commercial cargo reached its destination safely and on schedule.

    • Aerospace / Aviation
    Packed air freight on a roller pallet in front of a cargo aircraft on the airport apron

    Secure Helicopter Air Freight

    Germany

    Brazil

    Challenge
    High-value cargo
    Via
    Air

    Transporting a high-value helicopter across continents leaves little room for error. When an aerospace customer needed to move a helicopter from Germany to Brazil, Röhlig developed a carefully coordinated air freight solution that protected the fuselage and associated components throughout the journey. Close cooperation between Röhlig Munich and Röhlig Brazil enabled the teams to manage the specialist handling, regulatory requirements and operational schedule from origin to destination.

    • Renewable energy and solar power
    Construction site with containerised energy storage units, crane and solar field in a vast desert landscape from above

    71 BESS Units Installed at a Solar Park in Chile

    Chile

    Chile

    Challenge
    On-site installation
    Via
    Contract logistics

    At the final installation point, every movement mattered. A renewable energy customer required 71 Battery Energy Storage System (BESS) units to be lifted and positioned precisely at a solar photovoltaic park in Huatacondo, northern Chile. Working under demanding desert conditions, Röhlig Chile delivered a coordinated, month-long operation covering planning, specialised lifting, heavy cargo handling, warehousing support and on-site execution. All 71 units were installed safely, accurately and on schedule.